Leaderboard Ad

Showing posts with label Smart Growth. Show all posts
Showing posts with label Smart Growth. Show all posts

Friday, October 9, 2015

A Trick to Get More Halloween Treats

I started thinking about this post several weeks ago, around the time that all of the drug store chains and supermarkets started stocking their shelves with Halloween candy and decorations.  I was initially thinking ahead to how I can startle trick or treaters walking up to my front door on Halloween night.  Then I realized I probably won't get the opportunity to do that, because I expect I'll be accompanying my daughter as she trick or treats.

My daughter is old enough to trick or treat in our neighborhood, unsupervised, with a friend, and there are ample well-lit sidewalks to get her around the development.  But she prefers to trick or treat with friends in a different neighborhood.  And it's all about efficiency.


She can hit up three times as many houses per hour in her friend's neighborhood of townhouses than she can in her own neighborhood of homes on 0.4-acre lots. At the townhouses, with front-loading garages lining the streets, the average distance between the front doors is about 25 feet. Back home, trick or treaters have to walk anywhere from 90 to 130 feet from front door to front door (side-loading garages require much wider lots). And that's assuming the kids cut through the grass from house to house instead of walking back out the driveways to the street (anywhere from 30 to 70 feet) and then up the next driveway and sidewalk to the next front door.
My neighborhood. Very circuitous trick or treating because of large lots.

Of course this comparison is apples (hopefully candied, without razor blades) to oranges. These two neighborhoods are two different types of homes and two different price ranges. An average of 1,800 square feet of living space to an average of 2,500. And a difference of 0.15-acre lots to 0.41-acre lots.   But my point here is the usefulness of the extra 0.26-acres per lot in my neighborhood. If someone wants to have a swimming pool in their yard, they would need that extra quarter of an acre. But as you can see on the aerial photo above, fewer than 10% of the homes in my neighborhood have pools. And sure, it's extra room for kids to play. And that's important. But for the adults, it seems to me that the more distance between homes, the less likely it is that neighbors will get to know each other. Fewer opportunities to converse. Relegated to waving to the guy two houses away (200 feet away) while at the mailboxes. Bigger homes on bigger lots, with less sense of community.
My daughter's friend's neighborhood.
Much more efficient for trick or treating
in a development of townhouses. 

When I accompany my daughter trick or treating in her friend's neighborhood of townhouses, with front doors just two dozen feet apart, there is a totally different vibe. Many of the neighbors are on their doorsteps or on lawn chairs in their driveways chatting with their neighbors in between groups of ghouls grabbing Mr. Goodbars.

The differences between these two neighborhoods are based on land use decisions that the township made 20-30 years ago when they instituted the current zoning districts with different minimum lot sizes. But regardless of lot sizes, this sort of intense development eats up wildlife habitat. And lawns are a very poor excuse for wildlife habitat. It is crucial to preserve ample green spaces and natural areas in between developments to avoid full-scale sprawl like you see in these two aerial photos. We humans tend to forget that we need trees and natural areas around us to improve our quality of life. My township was primarily agricultural 50 years ago. But as farmers wanted to retire, farms were gradually sold to developers. And some of the best agricultural soil in Pennsylvania has been essentially lost forever. We now have relatively few active farms remaining and have become just another suburb of Allentown, the third largest metropolitan area in Pennsylvania. My township's population is now about 31,000. Our population has increased more than 60% since 2000 thanks to a feeding frenzy of developers fed by a clueless Board of Supervisors.


But at least my neighborhood and my daughter's friend's neighborhood have sidewalks. None of the earliest developments in this township, built from the 1960s up to the early 1990s, were required to have sidewalks. Kids in those neighborhoods have to walk in the street when trick or treating. That's the kind of dumb growth you get when municipal leaders fail to lead and simply cave in to pressure from developers to cut corners.

And back home, I guess my daughter will be trick or treating in the neighborhood where she'll have to do less walking to get more candy. Smart girl.



Monday, May 25, 2015

The Power of Trees to Unite a Community

This is a post about the power of trees. The power of trees to unite a community. The power of trees to provide hope for the future. The hope that trees will unite a community going forward into the future.

This post is actually coming a month late, but I thought it is still worth talking about. Most states celebrate Arbor Day on the last Friday in April every year. Arbor Day was first celebrated in Nebraska in 1872 as a way to encourage communities in the fledgling state to plant trees in the towns that had been treeless prairies only a few decades before. My own community, Lower Macungie Township, PA, was primarily rural through much of the 20th century and focused on agriculture. Since 1971, however, Lower Macungie has gone from 10,521 acres of farmland to less than 3,000 currently. And from 8,814 residents in 1970 to over 31,000 in 2010. That is a 250% increase in 40 years, compared to the U.S. population, which increased just 51% in that same 40-year period. In the first decade of the 21st century, we had the dubious designation of fastest growing municipality in Pennsylvania.

One of the results of the rapid and poorly planned development of Lower Macungie over the past 30 years has been fragmentation. As large farms were gradually sold off to developers, we saw increasing fragmentation of wildlife habitat as well as fragmentation of human habitat. Nearly every large residential development built during the growth years was not connected to the rest of the community by any means other than automobile.  If a development was required to have sidewalks (which did not happen until the late 1990s), the sidewalks tended to dead-end at the limits of the project. No forethought was given to requiring connecting sidewalks to get to adjacent developments or even just to get outside of the development without having to walk the circuitous sidewalks though along the streets that were laid out in patterns reminiscent of a medieval labyrinths.

Photo credit: Sharon Schrantz, East Penn Press
This year the township’s Environmental Advisory Council (EAC), which I chair, initiated our first annual Arbor Day event. I felt that beginning an Arbor Day tradition in the township could be a way to address two concerns I have:  it would add back a small bit of the nature we’ve lost through the past decades of development, and it would be an opportunity for residents from different developments to join together to celebrate planting a new tree in a township-owned open space.

The EAC selected a location for our Arbor Day tree that is near the only elementary school in the township that has sidewalks leading to it and which is safely by foot from at least six different developments.  Had it not been for the school being built five years ago, this area would still not have any sidewalks connecting the surrounding developments.  The location we chose for our Arbor Day tree is an underutilized parcel that the builder of an adjacent development had to donate to the township as ”recreational open space,” primarily because a floodplain separates it from the rest of the development. The parcel is about 6.5 acres if you don’t count a stormwater channel bordering it on one side.  Because the parcel is categorized as recreational open space, the Public Works Department mows it regularly all summer long, whether it needs it or not. In the 10 years I’ve lived here, however, I’ve never seen anyone use the parcel for recreation.

Photo credit: Sharon Schrantz, East Penn Press
Our Arbor Day celebration on April 24 this year opened with a soloist from the local high school chorus (who happens to be my niece) singing the National Anthem, and with local Boy Scout Troop 131 presenting the American flag for the pledge of allegiance. The centerpiece of our celebration was our Arbor Day tree for 2015:  a northern red oak (Quercus rubra) that was placed in a pre-dug hole.  Following a few words from local dignitaries, we asked all in attendance to take a turn with a shovel and toss in some dirt to help backfill the tree. By adding even a handful of soil to the tree’s root ball, everyone present had taken place in planting the tree. And by doing so, they are part of the legacy of hope for future generations of residents who will enjoy the tree’s beauty and shade.

Our plan is to select different locations in coming years to plant the township’s future Arbor Day trees – locations that can be accessed by at least two surrounding neighborhoods so that people from different developments can be drawn to the beauty the trees will offer and enjoy the birds that will also share the trees with the community. H   opefully, the 30 or so residents who attended our first annual celebration this year will seek out future celebrations and will bring their friends and neighbors.
Photo credit: Addison George, Morning Call (www.mcall.com) 





Thursday, January 22, 2015

Big Step Forward for Preserving Some of Lower Macungie's Open Space

I really wasn't expecting to update last night's blog so soon. But at tonight's Lower Macungie Board of Commissioners meeting, Commissioner Jim Lancsek, who had previously spoken against efforts to preserve open space, presented a proposal to move open space preservation efforts forward.

Lancsek's proposal, which will have to go to the Board of Commissioners' Budget & Finance Committee for review and then a recommendation back to the board, suggested taking advantage of historically low interest rates for a bond issue or other financing options and possibly using surplus funds to preserve three key properties in the township. Lancsek said he doesn't support preserving open space without a functional purpose.  But he would support buying development rights for farms that, if fully developed with three or four single family homes per acre, would create excessive traffic problems for the township. He also said that he thinks it would be appropriate for the township to purchase in fee simple parcels adjacent to existing township parks so that those parks could be expanded.

The township's Environmental Advisory Council, which I chair, sent the commissioners a recommendation in spring of 2013 to allow a voter referendum to ask the residents whether they would support a fractional increase in our Earned Income Tax for a 5-year period to fund open space preservation. That recommendation was stuck in the Budget & Finance Committee until tonight when the Budget & Finance Committee recommended to the full board that no action be taken on the EAC's 2013 recommendation. Likewise, another potential open space funding recommendation that the EAC sent to the commissioners last year, which involved earmarking all real estate transfer taxes from a 700-acre commercial and residential subdivision that was previously zoned for Agricultural Preservation, was finally rejected by the commissioners. And I couldn't be happier.


I'm happy because the commissioners themselves looked for and found a viable means of funding preservation of some key properties in the township.  The EAC had discussed recommending a bond issue to get all of the needed funding up front to preserve several properties at once, but we thought that incurring debt would be frowned upon by more people than would take issue with a minor Earned Income Tax bump. And when I say minor, I'm talking about the price of one large two-topping pizza per month for someone earning the median income in our community. But that route would not have accumulated enough money to move forward with acquisitions for a few years. Mr. Lancsek's proposal could potentially get the money needed to preserve two properties borrowed and in the budget for next year.

This new proposal isn't a slam dunk by any means, but it is a very encouraging sign that one of our Board of Commissioners' biggest critics of open space preservation over the past three years has finally acknowledged the residents' wishes and stepped forward with an aggressive proposal that could make a real difference in what Lower Macungie will look like when we are fully built out in 20-30 years.  In three decades we might just have a few green patches remaining to separate the warehouses and cookie cutter houses from each other.

Wednesday, January 21, 2015

Why are Some Politicians Afraid of Voter Referendums?

I've blogged previously about my efforts with Lower Macungie Township's Environmental Advisory Council (EAC), which I chair, to try to get a formal open space preservation program up and running in our township.  We sent a recommendation to our township's Board of Commissioners back in April 2013, urging the commissioners to authorize a voter referendum about whether we should initiate a modest increase in our earned income tax (EIT) for a five-year period to fund open space preservation in our community.  That proposal has been hamstrung in the commissioners' Budget & Finance Committee ever since.
An endangered way of life in Lower Macungie Township
(photo credit: Morning Call).

Specifically, what the EAC wants to do is have the township partner with the county's Bureau of Agricultural Land Preservation to be able to make offers to township farmers to purchase the development rights for their land. The county's farmland preservation program has a cap on how much they can offer per acre for development rights. In some of the more rural northern townships in Lehigh County, they might be able to offer enough to get a couple of farmers interested. But here in Lower Macungie, our undeveloped land is some of the most expensive in the county.  The county program cannot compete here in Lower Macungie, so the township needs to ante up if we want to buy development rights for any of our remaining farms. When a farmer sells their development rights, they would still own the land and may use it in any manner than want. They just cannot subdivide it for a housing development. So when they eventually sell the farm, it would be sold as a farm rather than as building lots. We think it's the ideal free market solution to preserving some of our remaining farms. It is totally voluntary on the land owners' part. If they don't want to see their family farm bulldozed and built on but they need money to fund their retirement, selling their development rights and keeping their farm is a great option.

But Lower Macungie needs a source of revenue to be able to work with the county to make offers to our farmers for their development rights. We have proposed a temporary, 0.25 percent increase in our EIT for a period of 5 years, which could preserve a few of our farms. This exact funding mechanism has been approved in voter referendums in seven of 10 Lehigh Valley townships that have put it on the ballot. And the only way the EIT increase could continue after 5 years is by another voter referendum authorizing a finite extension. But before anything else, we need to get the question on the ballot to ask the Lower Macungie voters. I'm very disappointed that some of our commissioners are refusing to let the residents have a voice at the polls on a matter than most of the commissioners really don't seem to care about.

The two commissioners on the Budget & Finance Committee are unashamedly pro-development, so I don't think there is any interest in that committee in preserving farmland. In fact, one of those commissioners has publicly said that we already have enough open space. That statement is either incredibly naaive or incredibly arrogant. Because most of the farmland that we see when we drive around Lower Macungie has been zoned for several decades to allow either 12,000-square-foot or 18,000-square-foot residential lots. All it would take is the farmer holding up the white flag and saying, "I've had enough. I'm ready to cash in."

Three of our commissioners have also said that they oppose voter referendums for any reason at all. One of them has famously said that they are elected to make the tough decisions, and that not enough voters turn out at the polls for a referendum to mean anything. But using his logic, we could just as easily argue that the voters who turned out to elect each of them are not sufficient to constitute a mandate for them to make this sort of decision.


The question of whether to fund a farmland preservation program is actually much bigger than whether the township should buy a new dump truck, install a new traffic light, or even install an expensive artificial turf athletic field. Because whether or not we decide to fund preservation of our remaining farmland is a decision that will mold, one way or the other, what the township looks like in 20 years when there are no more buildable parcels of land bigger than 10 acres. In 20 years, will we still have a few open farm fields here and there? Or will we have nearly continuous expanses of vinyl boxes clustered around cul-de-sacs spitting out more cars to clog our already inadequate roads? The residents have a lot at stake here, because a fully built out township, and the traffic nightmares and crowded schools that accompany that scenario, will certainly devalue our properties. Isn't that something that the Lower Macungie voters have a right to decide for themselves?  Or maybe this will be the year that our elected officials surprise me and step up with their own plan to preserve open space in Lower Macungie. I'll keep you posted.

Monday, November 3, 2014

How New Development Can Help Fund Farmland Preservation

It seems like an oxymoron, but there is an opportunity to score funding for a municipality's Farmland Preservation Fund when a greenfield is sold to a developer. At least there is here in Pennsylvania with how our real estate transfer tax is divvied up after a property sale. In PA, the buyer and seller each pay a 1% transfer tax. Of that 2%, the municipality gets one half and the local school district gets the other half. For larger municipalities or places with large commercial or industrial properties that change hands from time to time, the local cut of the real estate transfer tax can be a nice supplemental revenue stream.

Back Story
I've blogged previously about a seemingly shady land deal that happened in 2010 here in Lower Macungie Township, so if you've already read about this back story please feel free to skip to the next section.  Lower Macungie is 22.6 square miles and is home to nearly 31,000 people. Over the past 20 years, we've experienced a lot of farmland being lost to developments - mostly residential, but some commercial and light industrial too. In 2010, the township's Board of Commissioners entered into a closed-door re-zoning agreement with the owner of the largest contiguous tract of agricultural land in our township, about 700 acres, nearly all of which was zoned for agricultural preservation. That land is now zoned as light industrial, highway commercial, and residential.

What did the township get out of that deal?  The guarantee that the land owner, one of the largest land owners and speculators in the two-county Lehigh Valley, would withdraw his proposal to build a quarry on that land. But that quarry proposal was just a bluff. If he had built a quarry, which was allowed under the agricultural zoning, it could only have been a fraction of the size he originally proposed, because: (1) there is a major petroleum pipeline easement running directly through the tract; and (2) I doubt that he could not have gotten approval from the PA Department of Environmental Protection (PADEP) to dewater the quarry to a workable depth without completely dewatering the adjacent Little Lehigh Creek, designated by PADEP as a High Quality Cold Water Fishery.  But the board of five commissioners at that time included three Realtors. The Realtors would be getting more inventory into the local real estate market if the land was developed, so it certainly worked out for them. Let's not even start talking about how the local farm roads cannot currently handle the truck traffic from the nearby warehouses that have already been built in the area.  

A Warehouse Grows on a Farm Field
Part of 700 acres of land in Lower Macungie Township that used to
be zoned for agricultural preservation but is about to be developed
into several large warehouses. (photo credit: www.mcall.com)
Three light-industrial parcels that were subdivided from 700 acres of formerly preserved agricultural land have been sold to a developer and are going through the approvals for construction of large warehouses. These will be the first of several light industrial parcels and commercial parcels sold and developed. Eventually there will be 400 new homes as well. All of these new greenfield projects are thanks to our previous Board of Commissioners that facilitated the sweetheart rezoning deal for our local land baron, who has an industrial-scale turkey farm that he tends to when he is not planning his next greenfield development project. Over the last several decades this nominal turkey farmer, and his late father before him, made a habit of buying thousands of acres of local farmland, farming the land for a while, and then selling the land off to developers when the time seems right. At least half of the 700 acres involved in the 2010 rezoning deal had already been zoned for agricultural preservation when the land baron originally bought the land. And he has the clout to get Realtors who moonlight as local politicians to bow before him, kiss his ring, and rezone land - without even requiring him to pay to upgrade the local roads that would service the land he wants to develop. But this is all in the past now. So how do we make lemonade out of this lemon of a rezoning deal?


Plans for new warehouses on land formerly zoned for agricultural preservation
in Lower Macungie Township. (photo credit: WFMZ.com)
By the time the 700 acres of formerly preserved farmland is fully developed, the township's total share of the real estate transfer tax revenue could be as much as $600,000. So far we've already seen $120,000 come into the township coffers from this revenue stream.  Since the residents of Lower Macungie were shafted on this rezoning deal that will convert 700 acres of farmland to sprawling warehouses, strip commercial boxes, and 400 homes with kids to burden the local schools, shouldn't the proceeds from the real estate taxes be used to offset that loss of open space? All real estate tax revenue from these former 700 acres of preserved farmland should be designated for a farmland preservation lockbox and used to help to purchase development rights from other local farms.

Unfortunately, $600,000 will be a drop in the bucket to purchase enough development rights to make a difference, but it is critical that we begin with the real estate tax revenue from this poster child for poor land use decisions and use it as seed money for a deliberate and defined effort to slow down the pace of greenfield development within our community. If we can start with earmarking this real estate transfer tax, we can then have a more serious discussion about a referendum to ask voters to authorize an earned income tax to more fully fund farmland preservation in our community.  Save it or pave it.

Saturday, August 2, 2014

Growing Smart Controls Long-Term Costs for Communities

I read this great article in Time earlier this week. It’s a brief primer for anyone who wants to hear about how so much of today’s sprawling suburban and commercial development that is touted as economic growth has the opposite effect in the long run. Chuck Marohn is a former municipal planner turned evangelist for Smart Growth.

I heard Chuck Marohn speak about a year and a half ago, and he converted me. The bottom line of Smart Growth is that communities must be sustainable, and new development far removed from existing population and infrastructure is typically not sustainable. All municipal officials should be doing long-term cost/benefit analyses for any new development projects they are considering approving, and private development should not be subsidized by public funds unless there is sufficient long-term pubic benefit.

Unchecked development in the present, sprawling into former farm fields, is not the path to future long-term prosperity. Developers who receive subsidies from state or local governments – whether it’s to extend a sewer line or road widening and traffic signalization – are typically no longer in town to share maintenance costs after the project is built out and sold. They are not around to share in the replacement costs of that new public infrastructure when it’s time to replace the first-generation structures. And because the long-term costs were not considered up front, the tax payers must pay perpetually for those project-specific improvements. It's amazing that more fiscal conservatives have not figured out that sprawl is fiscally unsustainability.

Where I live, in Lower Macungie Township, PA, our Planning Commission and former Board of Supervisors seemingly used to give developers almost anything they asked. Utility concessions, road improvements and stormwater infrastructure were all fair game. Accepting dedications of streets in new residential developments or industrial parks is nothing unusual in most areas, even though the municipality then becomes liable for all repairs, repaving and snow removal. And there is a public safety argument there, because emergency services vehicles need to reliably be able to get to emergencies in these developments.
Stormwater basin in Lower Macungie Townshp, PA
(photo by Lower Macungie Township)


Stormwater management is one thing that local governments certainly should not be subsidizing for developers. Until recently, our municipal government was accepting ownership and liability for stormwater infrastructure from developers. In fact, as of last Fall, out of 88 stormwater basins on record in the township, Lower Macungie township was fully responsible for 23 stormwater basins, with another 23 basins previously agreed to be dedicated to the township upon completion of the projects and transfer of the National Pollutant Discharge Elimination System (NPDES) permits from the respective developers. So the Lower Macungie taxpayers are on the hook to fund the perpetual maintenance on these stormwater facilities.
Four Seasons Development in Lower Macungie.
Development is not connected to surrounding
neighborhoods, but stormwater basins are
maintained by homeowners association.
(photo by Newton Engineering)

Our current Board of Commissioners has gone on record as saying that, going forward, they will no longer accept new stormwater facilities from developers. That's great, because it means that any new residential, commercial or industrial developments must maintain their own stormwater retention basins. That’s significant for new residential developments, because it means that they will have to form a homeowners association to manage their stormwater facilities and associated liabilities. But municipalities cannot afford to continue to absorb these long-term costs from the developers of subdivisions and the subsequent owners of the resulting parcels.

Emmaus, PA. A classic community with mixed-use areas and
a vibrant,walkable downtown district. (photo credit:
http://fltquest.zenfolio.com/img/s2/v4/p956485518-3.jpg)
So while my community’s new projects may remain subject to an illogical, Euclidean zoning map and might not be walkable or connected with the existing community in a Smart Growth kind of way, we can demand that new development must pass a cost/benefit analysis to ensure that the taxpayers will not be saddled with long-term costs unique to the new project.